Over the past two years, the common myth circulated among investors
has been "pounds in the ground." How many pounds of U3O8 does a company
have in the ground? The more pounds a company claims, and more
importantly gets institutions and investors to believe, the higher its
market capitalization has run. Bigger is always better in most cases,
but recovering uranium through an ISL operation, like any other mining
operation, has its quirks.
During the early stage of this uranium
bull market, pounds-in-the-ground was an important yardstick. But just
as one can have a million-ounce gold deposit, with a complexity of
metallurgical problems that prohibit a robust economic recovery or offer
a paltry grade of gold in the ore, investors may discover the same
problems in properly evaluating a company's uranium claims. Instead of
asking a company's investor relations department how many pounds of
uranium they have in the ground, find out how much uranium pounds they
can actually recover and produce, and how much it will cost them to mine
their property. Ask instead these questions:
o How permeable are the ore bodies you plan to mine?
o What is your average grade?
o Over what area does your rollfront extend?
o What is the depth of your ore body?
By
the time you have finished reading this feature, you should have a
better grasp on the economics of ISL mining. You should be better
equipped to make a more intelligent decision about your favorite
company. First, let's examine the nature of a uranium mineralized
rollfront. Understanding the rollfront will give you the key tools
required to accurately evaluate the prospects of any ISL uranium
development company.
THE "ROLL FRONT" IS YOUR FRIEND
In the
first article, we interviewed Charles Don Show, who helped pioneer ISL
uranium mining as an economic means to extract lower grade ore from
underground mining operations. In Snow's 1978 article entitled, "Gas
Hills Uranium District, Wyoming - A Review of History and Production,"
published in the Wyoming Geological Association Guidebook, he wrote
about the development of the "roll front" theory. He wrote about
discussions the project geologists were having in the summer of 1955
about Utah Construction Company's recently acquired option on the Lucky
Mc uranium properties in Wyoming's Gas Hill District:
"Offset
drilling Project 4 intersected one major mineralized zone with a grade
thickness product over 10 percent U3O8. An offset of this and one other
mineralized hole about 2500 feet away were barren. Many discussions of
why the ore was in these 'isolated' pods were carried on late into the
night... It was during the period of development of the reserves that
members of the staff started referring to different layers and separated
pods as areas of mineralization where chemical changes had caused
deposition and soon the word 'chemical front' was in common usage."
Three
years later, Paul A. Riddell prepared a report to document the ore
occurrences at the Lucky Mc mine. He was among the first to use
terminology that has since become an integral part of the "Roll Front"
concept. In his project report, Riddell wrote:
"In conclusion, the
uranium appears to be restricted to more porous beds, but is not evenly
distributed within these beds. The boundaries between ore and lean
material are erratic - sometimes sharp and sometimes gradational. They
do not appear to be related to changes in sedimentation within the beds.
Others have suggested that the boundaries represent 'chemical fronts,'
and this theory appears reasonable in light of present information."
Originally
called chemical fronts, these "pods" contained various grades of
uranium. Each pod or roll front is comprised of different
mineralization. Understanding that mineralization and how to extract the
uranium alone determines how viable a deposit might be.
If you
imagine roll fronts in a uranium area as if they were lily pods in a
pond, you are off to a good start. When a company announces it has
uranium mineralization on its property, this could mean it has many
pods, or fronts. Ideally, you hope to have multiple "fronts" available
on your ground. "Typically, the meat of the front (multiple percent of
uranium) is only a few feet to ten feet wide at the most," Strathmore
Minerals president David Miller explained. "This is the part that your
ISL wells have to address correctly. If you look at all the
mineralization in a single front system, above 0.03 percent, then from
the tails to the front could be 100 feet or more. If you look at the
multiple fronts in stacked sands, and you look at one end of the system
to the other, the width can be several miles. The length of any of these
can be tens of miles, but the good stuff comes and goes."
Miller
compared these multiple fronts to "pearls on a string." There may be
one, two or three roll fronts in one well field. "There may be more than
three roll fronts," Miller added. "There may be that many or more even
in one pattern." Again, they are pods and they may be stacked in layers,
like lasagna. "The number of roll fronts in a pattern does not really
matter, except for operational reasons," Miller explained. "It is more
complex to properly address multiple roll fronts than a single roll
front, and you may not be able to optimize recovery of all of them."
PERMEABLITY IS THE KEY
Getting
down to the business of ISL mining a roll front requires that we
understand the role permeability plays in this mining method.
Permeability is the flow rate of the liquids through the porous
sandstone. Knowing what the permeability of the orebody will let you
know how much water you can get through the sandstone formation.
According to Uranerz Energy Chief Executive Glenn Catchpole, who is also
a hydrologist, the typical porosity of sandstone is 10 to 20 percent.
Porosity is the void space between the sandstone grains. By comparison,
clay has a porosity of between 45 and 55 percent. Catchpole said, "A
property's formation has to have sufficient permeability to make the
project economic."
In order to dissolve the uranium into solution,
you have to know the "pore volumes." That's the measure of the pore
space in the rock. "You're passing fluid through the formation about 30
times to dissolve the uranium," explained UR-Energy Chief Executive
William Boberg. "Part of a successful operation is knowing how many pore
volumes we feel it's going to take to make it all work." Uranium Energy
Corporation Chief Operating Officer Harry Anthony, an internationally
recognized ISL expert, noted, "You need higher grade ore for tight
formations. With high permeability, you can space your wells further
apart."
As with any industry, it boils down to economics. How much
to operate the plant? Anthony gave an example of an ISL plant operating
at 5000 gallons per minute. Running 24 hours daily, the plant would
process 7.2 million gallons of water. That's more than 2.6 billion
gallons of water processed every year. Operating costs are based upon
cost per thousand gallons of water. "This includes electricity, reagents
and labor," said Anthony. On a daily basis, it would cost more than
$21,000 to run an ISL plant, based upon Anthony's calculations of $3.03
per thousand gallons of water. Using a 5,000 gallon per minute scenario,
a plant might produce 2360 pounds of U3O8 every day or 80,000 pounds
monthly. The cost to produce each pound would be $8.18. Using that math,
the uranium grades would be about 44 parts per million (ppm) or 0.08.
Anthony said, "I like to see 70ppm or higher." A grade of 0.13 is 75ppm.
With
low permeability in a tight formation, you may need to space more wells
in a typical well field pattern. How much does each well cost? That
depends upon the depth of the roll front deposit. While explaining that
costs are fixed and variable, Anthony computed the cost of a production
well for a 500 foot deposit at $15,000. An injection well could cost
$11,000 to install. By comparison, in New Mexico, where the deposits are
wider and of higher grade, a 2000-foot production well might cost
$27,000 and the injection well could cost $18,000, and it would still be
economic.
Why are we talking about well installation costs?
Again, it comes back to permeability. If the flow rate is lower,
bringing an ISL well field into production costs more. Glenn Catchpole
explained, "If your plant is running at 3000 gallons per minute (gpm),
and the formation is tight, each production well might only have 10gpm
flowing. A more permeable formation might have 20gpm flowing." That
means twice as many production wells are required to satisfy the ISL
plant's 3000gpm flow level. Installation costs have doubled, and that
would also impact operating costs. And a company which once might have
looked like it had an economic orebody could now smell like week old
fish.
PUMP TESTING FOR PERMEABILITY
"The pump tests are
extremely valuable," explained Boberg. "The pump tests are one of the
go/no-go considerations for what we're doing." Boberg told us UR-Energy
expected to start drilling by the end of April or May on their Lost
Soldier property in Wyoming. "We'll be putting in the initial drill
holes for the tests, and we'll be doing the pump tests following that."
In one of series of tests, Boberg explained, "We take a core out of the
hole (3 inches diameter and 6 inches tall) and test it vertically by
forcing fluid through it." Because the movement of the fluids in the
substrata, from one well to another, is horizontal, the only way to
really find out the permeability and porosity is by drilling a hole and
putting a pump in it.
Catchpole explained the procedure, "You put
the equipment down your monitor wells to measure drawdown." Quite
simply, you measure how far the water goes down. "The pump test will
tell you permeability." A good pump test takes between 24 and 72 hours
to complete. Catchpole's Uranerz Energy plans to run their pump tests
this summer on their Excalibur property in the northeastern Wyoming's
Powder River Basin.
The make-break point for a formation's
permeability is its Darcy rating. How high is the Darcy? A typical Darcy
can range from minus 1000 to plus 3. The higher the Darcy, the more
permeable the formation and that would help determine how economic the
orebody is. An acceptable range would be one-half to one Darcy. What is a
Darcy? Catchpole said, "It is gallons per day over feet squared." He
added a pure hydrologist would calculate the feet per day or centimeters
per second to get a more accurate permeability assessment. However, the
Darcy is a widely accepted measuring unit in the industry.
Until a
company gets its Darcy rating on its property, one can't be completely
certain the property can be mined by ISL. What guidelines does one
depend upon? Catchpole said, "Historical research can give you
permeability levels for a formation." So we asked Catchpole how he felt
about his Excalibur properties. He answered, "We know our properties are
permeable enough." How permeable will be answered with the pump tests.
OTHER FACTORS
Uranium
grades can be a contentious point, so we asked our ad hoc panel of
experts. "Grade is the driving force," Harry Anthony shot back. We asked
him about companies which said they could run an economic ISL operation
with grades as low, or lower than 0.02. Anthony laughed, "They are
crazy. They'd be out of business before they started." Catchpole was
more reserved in responding, "It probably wouldn't have an economic
recovery." Strathmore's David Miller offered a more technical analysis,
"Frankly, that will not likely have enough recoverable pounds. The
operating grade feeding the plant will be too low. What is the best
grade? 0.5, 0.10, or 0.15. It depends upon the deposit."
How much
can you actually recover? Boberg explained the problems of
pounds-in-the-ground. "Let's say we've got 100 million pounds of uranium
now. How much of that can we actually mine? There may be 10 million in a
particular orebody that looks like we can mine it. If we build an
operation around that, we might be able to develop an access to maybe 7
million pounds of that. And in a recovery process, we might only be able
to recover 70 percent of that." Every company has to also be very
careful in studying their orebodies before building their plant. "We've
got to make sure that the plant we're building isn't built over a
potential resource," Boberg emphasized. "We've got to drill under that
to make sure we're not accidentally putting the plant over another part
of the deposit."
Another worry with an orebody is channeling. "You
don't want channeling," Catchpole insisted." Channeling suggests the
water is going through a very narrow path. "If your orebody has a
thickness of ten feet and your channel of flow is one foot, you are
missing most of the uranium formation," said Catchpole. "You may have
good flow rates, but not much U3O8 recovery." Sometimes, a channel can
be a natural occurrence, where the flow is along a fault. The channel
creates a smaller, but preferred path for the fluids to flow through. .
Unlike fracturing a formation to release natural, or coalbed methane,
gas, a fractured channel has the opposite effect on ISL uranium mining.
How
much does it cost to install a well field pattern, and is it economic
to do so? "The art part of an ISL operation is interpreting the ore body
and the hydrology," Catchpole explained. "Your hydrologic test results
determine where you think the solutions are going to flow best. In other
words, which direction has the best or least permeability. This has to
get factored into how you lay out those patterns, the width of your
orebody, and how far out to the edge of the orebody you go."
In a
well field pattern, Strathmore's David Miller can determine the economic
viability of the ground. "The keys to what is recoverable are: (a) how
many pounds are recoverable per pattern? And (b) what does it cost to
install a pattern?" Miller explained. "If you have 10,000 pounds in
place and can recover 8000 pounds, your well field development cost can
be $8/pound, if it costs you $80,000 to install that pattern. Add your
operating cost, capital amortization and restoration cost, and you would
have a total cost."
Finally, the cost to install a pattern also
depends over how much territory your roll front deposits run. "Ten
million pounds over an area of one-half mile will cost less than those
same pounds over an area of two to four miles," remarked Terrence Osier,
senior geologist for Strathmore Minerals. "That means more injection
wells and more production wells." Depth of the wells influences its
installation cost, as mentioned previously, and impacts its daily
operating cost. "When uranium costs were very low, a few years ago, a
company needed 70,000 pounds per pattern," Harry Anthony commented. "Now
a company might only need 20,000 pounds per pattern to make it
economic."
There are many variables within the above advices
provided by these experts. However, the important point to realize is
the time of hyperbole and hoopla over "pounds in the ground" has passed.
As more uranium development companies move closer to establishing an
ISL operation, the go/no-go consideration, as William Boberg aptly
described it, will come down to permeability. After that, the economics
of a project will either make it viable or not.